Power to the rack
22 kV HT tie and CSS cables, LT feeders to 16 line ups, PDUs, UPS, fan wall units, PAHUs and CDUs, distribution boards, earthing, and rack whips and sockets on five tiers of wire mesh containment.
700+ MW campus
Chandanvelly, Hyderabad
The project
Electrical, HVAC, IBMS, BMS and MaxCool, CCTV and ELV, fire protection and PHE for the ground floor, covering COLP 1, COLP 2, the lower ground floor, common services and base build interfaces, from supply and lifting through installation, L1 to L5 testing, commissioning and handover.
Project overview
2 active projects22 kV HT tie and CSS cables, LT feeders to 16 line ups, PDUs, UPS, fan wall units, PAHUs and CDUs, distribution boards, earthing, and rack whips and sockets on five tiers of wire mesh containment.
Chilled water floor and header piping with valves, insulation and cladding, connections to the CDUs, and 22 industrial DX dehumidifiers with standby units for both halls.
VESDA, water leak detection, fire alarm devices, BMS, MaxCool, EPMS connectivity, access control and CCTV, with the interface coordination role and integrated systems testing manpower.
Chilled water floor and header piping with valves, supports, insulation and cladding. CDU connections for liquid cooling. Industrial DX dehumidifiers for COLP 1 and COLP 2.
MEP totals 78%: HVAC 38%, Electrical 31%, PHE 3% and FF 6%. ELV & BMS is 22%. The split illustrates scope; it does not measure contract value, quantities or progress.
Chilled water headers, valve stations, pump skids, pre action valve sets and containment planned for DfMA delivery from a near site hub.