Civil works, foundations and interiors built around the requirements of integrated services.

5
Civil projects in the register
4
Active or nearly complete civil projects
Tata Dholera, CtrlS DC6 and 7, VISTA Centre and SMARR City Centre
4 floors
Fitted out inside a live data centre
CtrlS DC6 and 7, floors 6 to 9

Our scope

What we deliver.

Civil works built around the requirements of integrated services.

01

Foundations and enabling works

02

Civil infrastructure works

03

Partitions and interiors

04

Raised floors and precision grouting

05

Trenches and utility corridors

Civil portfolio

Four active or nearly complete projects.

Tata Dholera

Tata Dholera

Dholera · ₹70+ cr

Civil and electrical duct bank

CtrlS Data Centre DC6 and 7

CtrlS Data Centre DC6 and 7

Navi Mumbai · ₹150+ cr

Civil interiors, electrical, HVAC, IBMS, fire, PHE

VISTA Centre

VISTA Centre

NCR · ₹80 cr

Civil

SMARR City Centre, Shishta Buildwell

SMARR City Centre, Shishta Buildwell

NCR · ₹70 cr

Civil

By industry

Civil scope inside the services package.

Data centres

Civil interiors

Raised floors, partitions and false ceilings in data halls, equipment plinths and foundations, trenches, fire stopped penetrations.

Industrial

Civil and enabling works

Equipment bases, utility corridors, duct banks, chambers and support foundations where awarded. Openings, fire stopping, access and local reinstatement coordinated with the services.

Cleanrooms

Envelope and finishes

Wall and ceiling panelling, cleanroom doors and view panels, epoxy flooring and sealed penetrations through every boundary.

Office and hotel

Fire stopping

Specified fire stopping package for MEP penetrations through rated walls and slabs. Coordinate sleeves and openings with the general contractor and record completed seals.

Explore the systems

A closer look.

Raft, pile and combined foundations engineered against soil investigation, load take down and seismic zone.

Explore Foundations & Structural

On our projects

Civil scope across our projects.

The scope we hold for this service on each project, as stated in its scope of work.

Data centres

CtrlS DC6 and 7Mahape, Navi Mumbai

Fire rated partitions, doors and ceilings. Epoxy and PU flooring, plaster and paint. Support grids, fire stopping, sanitary fit out and making good.

Semiconductor and industrial

FoxconnDevanahalli, Bengaluru

Civil works within the campus packages. Cleanroom envelope interfaces, service openings, equipment access and local making good within the assigned packages.

Excavation, bedding, thrust blocks and duct bank concrete/chambers within TPL packages. L&T underground civil activities remain in L&T scope. Separate duct bank rates are unavailable.

Commercial and residential

Prestige BKC 101BKC, Mumbai

Specified fire stopping package for MEP penetrations through rated walls and slabs. Coordinate sleeves and openings with the general contractor and record completed seals.

Civil scope as stated for each project. Shares marked illustrative show scope, not contract value, quantities or progress.

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Method of working

How the work is controlled on site.

28 controlled methods connect Civil & Structural design intent to work sequence, inspection, testing and handover.

Review the full method index
CV-MS-01Civil & Interior

Site Establishment Survey Control and Setting Out

Site Earthworks and Substructure

CV-MS-02Civil & Interior

Excavation Shoring and Dewatering

Site Earthworks and Substructure

CV-MS-03Civil & Interior

Engineered Fill Backfilling and Compaction

Site Earthworks and Substructure

CV-MS-04Civil & Interior

Piling Installation and Load Testing

Site Earthworks and Substructure

CV-MS-05Civil & Interior

Reinforced Concrete Foundations and Substructure

Site Earthworks and Substructure

CV-MS-06Civil & Interior

Below Grade Waterproofing and Joint Protection

Site Earthworks and Substructure