HT & LT Distribution.
High-tension to low-tension distribution — 33/22/11 kV systems, transformers, LV switchgear and the cable management that ties them.
Systems & scope
What this covers.
HT reception & ring main
33 / 22 / 11 kV HT systems with ring-main units, vacuum circuit breakers, and SCADA-integrated metering at the point of reception.
LV switchgear & MCC
Form-2b/3b/4 LV switchgear, motor control centres, intelligent breakers with networked trip units, and BMS-integrated metering.
Cable distribution
MV/LV cable distribution on cable trays, ladders and direct burial. Fire-resistant cable for life-safety circuits; XLPE for the rest.
Engineering approach
Short-circuit analysis and protection coordination are run in ETAP or DigSILENT against the operator's grid impedance. Relay settings are commissioned via primary injection — never by setting the dial blind.
Cable routes are coordinated in Revit with all other MEPF services and structural openings. Cable trays are sized for 30% future-load growth as a baseline.