What we do

Operations & Maintenance.

Planned maintenance, operational support and system checks throughout the life of a facility.

7
Client sites on AMC and O&M
Served by our field engineers and technicians
36 months
On site operation after STPI Mohali
Comprehensive maintenance under the CPWD agreement
10 years
Comprehensive AMC term offered
For BMS and controls, renewable
8
Amity campuses and schools
FY17 to date, with lifecycle O&M

After handover

Support through the defects liability period and beyond.

AMC and O&M from our service team, on seven client sites today.

01

Defects liability period

Service engineers attend defects through the defects liability period.

02

AMC and O&M

AMC and O&M service across seven client sites with a field team of engineers and technicians.

03

Preventive and predictive maintenance

Preventive and predictive maintenance and rapid response teams, including continuous HVAC operation for NCR hospitals in the pandemic.

04

Trained operating team

Your operating team trained on the installed systems, with a complete handover record.

05

Remote monitoring

Every building on one dashboard, watched by our service desk and visible to you on any device.

06

Operating data kept for analysis

BMS audit, alarm rationalisation, anomaly detection and lifecycle insight from operating data on O&M and Intelligent Solutions sites.

On our projects

Systems we built and then kept running.

STPI Incubation Centre, Mohali

36 months of operation

Data centre grade cooling and controls delivered and then operated for three years inside a government contracting framework.

Nalanda University

Annual maintenance

Annual maintenance by our service team, with the operating data kept for analysis.

Amity Group

Lifecycle O&M

Eight campuses and schools since FY17: universities and schools with lifecycle O&M.

Prestige BKC 101

One year after handover

Operation and maintenance of the building management system for one year after handover.

Comprehensive AMC

Keep the systems healthy, and stay accountable for the results.

Implement and maintain

For BMS and controls: we keep the system healthy and stay accountable for the results under a comprehensive AMC.

  1. 1

    Audit

    Existing BMS, sensors and sequences checked; faults listed and costed.

  2. 2

    Connect

    BMS, meters and plant data connected to the cloud platform.

  3. 3

    Configure

    Points mapped, dashboards built, alarms and rules set with your team.

  4. 4

    Operate

    Our service desk watches alarms and asset health, and attends site.

  5. 5

    Review

    Faults closed, energy saved and next actions reviewed every quarter.

What it covers

  • Preventive maintenance

    Health checks, firmware updates, backups and calibration

  • Corrective maintenance

    On site support for faults and breakdowns

  • Remote support

    Alarm and schedule optimisation, remote diagnostics

  • Reporting

    Quarterly reports with asset health and recommendations

  • Spares

    Faulty BMS components replaced under the contract

  • Records

    Controller configurations and trend logs backed up

Visits and term

  • Q1 and Q2

    Full system audit, then sensor calibration

  • Q3 and Q4

    Network diagnostics, then the year end review and backup

  • 10 years

    Comprehensive AMC term offered, renewable

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Method of working

How the work is controlled on site.

27 controlled methods connect Operations & Maintenance design intent to work sequence, inspection, testing and handover.

Review the full method index
CV-MS-04Civil & Interior

Piling Installation and Load Testing

Site Earthworks and Substructure

CV-MS-28Civil & Interior

Civil Works Testing Completion and Handover

Inspection Repair and Handover

DC-MS-19Data Centre

Integrated Systems Testing and Failure Mode Validation

Integrated Systems Testing

EB-MS-01ELV & BMS

Control Panel Manufacture and Factory Testing

Controls and Automation

EB-MS-04ELV & BMS

Control Sequence Commissioning and Cause and Effect Testing

Controls and Automation

EB-MS-08ELV & BMS

Supervisory Graphics Trends and Operator Handover

Controls and Automation