Skip to content
Unique Engineers.

What we do

Precision & Process Engineering.

Specialist utilities and high integrity piping for advanced manufacturing and cleanrooms.

3
Process engineering projects in the register
14,000 sqm
On each of two cleanroom floors at Foxconn
ISO 7 and ISO 8, completed in three months
SS 316
Process cooling water piping in SS 316 and PP H
Hydro and pneumatic tested, with OEM validated hook ups
ISO 14644
Qualification standard
IQ, OQ and PQ to ISO 14644 Part 3

Our scope

What we deliver.

Specialist utilities and high integrity piping for advanced manufacturing and cleanrooms.

01

Cleanrooms

02

CDA, nitrogen and vacuum

03

Process cooling water

04

High integrity piping

Process piping and distribution

Executed across the semiconductor, industrial and data centre portfolios.

PCW

Process cooling water

Closed loop process water headers, primary and secondary interfaces, SS 316 and PP H piping, hydro and pneumatic testing at Foxconn.

CDA

Compressed dry air

Oil free compressor and dryer skids, multi stage filtration to dew point class, SS and aluminium distribution, point of use regulators.

Gases

Nitrogen and vacuum

Nitrogen and vacuum networks with point of use drops, leak tested and integrated without breaching contamination zones.

Underground

Tata Electronics, Dholera

Underground utility piping: the main header runs that will feed future point of use distribution for the fab.

Industrial

Process and precision piping

Precision utility piping, compressed dry air, nitrogen, vacuum and water services. Equipment tie ins, valves and supports with material and joining requirements matched to each process.

DC loops

Data centre portfolio

Large closed loop secondary distribution with N+1 and 2N redundancy, plate heat exchanger interfaces and balancing discipline.

Cleanroom credentials

Class 10,000 and 100,000 executed.

The engineering step to ISO 6 is fully worked out.

Class 10,000 and 100,000

ISO 7 and ISO 8 assembly cleanrooms for Foxconn in Bengaluru: two floors of 14,000 sqm each, completed in three months with more than 1,500 people on site.

Process piping at Foxconn

Compressed dry air, nitrogen and vacuum networks with complete precision MEPF, routed with strict slope control and leak tested.

Cleanroom envelope

Wall and ceiling panelling, epoxy flooring, HEPA filtered AHUs, return air risers, cleanroom doors and view panels.

Controls

PLC programming of AHUs and BMS integration across the controlled environment estate at Foxconn.

Projects

Foxconn, Tata Electronics and JSW.

On industrial projects the PHE column of the scope of work includes the stated process and utility piping.

Foxconn, BengaluruActive

Foxconn, Bengaluru

Client
FoxconnThrough Cinda Engineering
Location
Devanahalli, Bengaluru
Status
ActiveCampus work packages
Work order value
₹611 crAugust 2026 order book
Facility
Electronics plantManufacturing and support
Programme
Package specific

Multiple campus packages spanning MEPF, cleanroom and process utilities, civil works and industrial automation.

View the case study
01

MEP

MEPF, cleanroom and process utilities.

02

BMS

Industrial BMS and AHU/MAU PLC.

03

Civil

Civil and package enabling works.

Scope of work by service

Select a service

Water and process utility piping. Compressed dry air, nitrogen, vacuum and precision utility connections.

MEP totals 72%: HVAC 33%, Electrical 19%, PHE 10% and FF 10%. ELV & BMS is 13% and Civil is 15%. The split illustrates scope; it does not measure contract value, quantities or progress.

Package inspections, system test records, utility commissioning and phased area release.

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Start a conversation

Let’s discuss your project.

Get in touch