DfMA and modular MEP.
Spools, riser sets, valve stations and pump skids built and tested off site, then lifted in when the workfront is ready.
DfMA and modular MEP
One module, built and tested off site.
Start with repeatable geometry, stable vendor data and accessible connections; keep variable interfaces flexible.
Scroll to take the module apart

01Standardise
Module frame
Module families, joints and lift limits defined so repeated halls and floors use the same assemblies. Built on jigs to frozen dimensions, with fixed datums and repeatable joints.

02DfMA suitability by service
Mechanical, high fit
Chilled water spools and headers, pump and CDU skids, valve stations and CRAH connection sets.

03DfMA suitability by service
Electrical, high fit
Multi tier cable containment, busway sections, power skids and earthing assemblies.

04DfMA suitability by service
Fire protection, high fit
Sprinkler mains and risers, pre action valve sets, and pump and header skids.

05DfMA suitability by service
Plumbing, medium fit
Condensate and drainage headers and booster sets, where falls can be controlled.

06DfMA suitability by service
Controls and ELV, medium to high fit
Control panels built and function tested off site, skid wiring, containment and junction boxes.

07Five gates before dispatch
QA and dispatch
Tested, recorded and packed with caps, covers and a traceable module ID. Pressure tests on piping, insulation resistance on electrical, functional checks on skids.

08Factory to site
Site integration
Lifted to the released landing zone, aligned and interconnected.
AdaniConneX HYD 22 and HYD 23, HyderabadFire protection and HVAC spools and assemblies built off site. Modules travel about 40 km from the DfMA setup.
DfMA and modular MEP
Built and tested off site. Lifted in when the workfront is ready.
Assemblies are built and tested off site, then lifted in when the workfront is ready. No module leaves the workshop until its quality gates are closed.

Five gates before dispatch
- G1
Material and certificates
Incoming material checked against the approved submittal and certificate of conformity.
- G2
BIM and dimensions
Module checked against the frozen model: lengths, datums and connection points.
- G3
Weld, groove and torque
Joints inspected for weld quality, groove profile and bolt torque.
- G4
Pressure, IR and function
Pressure tests on piping, insulation resistance on electrical, functional checks on skids.
- G5
Dossier and dispatch
Records closed; module tagged, protected and released for transport.
On our projects: AdaniConneX HYD 22 and HYD 23, Hyderabad, with fire protection and HVAC assemblies prefabricated off site.
The model is frozen before fabrication.
Every module passes five gates before it can leave the workshop.
- 1
Coordinate
Routes, access, maintainability and interfaces frozen in the federated model at LOD 400.
- 2
Standardise
Module families, joints and lift limits defined so repeated halls and floors use the same assemblies.
- 3
Release
GA and spool drawings, bill of materials, weld map, QA plan, tags and lifting data issued as one pack.
- 4
Fabricate and close
Built on jigs to frozen dimensions at a near site hub, inspected, tested, recorded and protected before dispatch.
Factory to site
Dispatch
Modules sequenced to the installation window.
Lift plan
Route, rigging, crane and landing zone confirmed before dispatch.
Install
Lift to the released landing zone, set datums, connect and inspect.
Hold point: no module leaves the workshop until its quality gates are closed, and none is lifted until the workfront and lift plan are released.
DfMA suitability by service
Start with repeatable geometry, stable vendor data and accessible connections; keep variable interfaces flexible.
Fit and typical modules
Mechanical, high fit
Chilled water spools and headers, pump and CDU skids, valve stations and CRAH connection sets.
Electrical, high fit
Multi tier cable containment, busway sections, power skids and earthing assemblies.
Fire protection, high fit
Sprinkler mains and risers, pre action valve sets, and pump and header skids.
Plumbing, medium fit
Condensate and drainage headers and booster sets, where falls can be controlled.
Controls and ELV, medium to high fit
Control panels built and function tested off site, skid wiring, containment and junction boxes.
Kept site built
Final branches, live tie ins, vendor sensitive tails and oversize modules that transport limits would undo.
Validate by module family and compare total installed cost, not shop cost alone.
DfMA against traditional SITC
DfMA moves complexity off site; traditional SITC carries it into the workfront.
Traditional and DfMA
Design
Traditional: late releases trade by trade. DfMA: the model and interfaces frozen together.
Production
Traditional: cut and fit on site. DfMA: a controlled assembly line.
Logistics
Traditional: loose materials. DfMA: tagged, lift ready modules.
QA and testing
Traditional: checks after installation. DfMA: factory gates, then site integration.
Why DfMA
Value comes from control, not from an assumed saving. Dense, repeated and critical systems gain the most.
Where it gains most
Dense MEPF zones
Risers, corridors and plantrooms carry more services per lift and per release.
Repeated blocks
Halls, floors and skids repeat, so standard modules improve with every set.
Factory QA
Defects close in the workshop before dispatch, not in a congested workfront.
Compressed workfronts
Fabrication runs while civil work progresses, so site windows stay focused on installation.
Less double handling
Modules arrive tagged and lift ready and move once, to the released workfront.
Less rework
Dimensional, weld and pressure checks happen before transport, not after installation.
Fewer site stations
Less temporary works, hot work and cutting at height on site.
Better material use
Planned cuts from the frozen model reduce waste and offcuts.
Split DfMA delivery at AdaniConneX
HYD 22 and HYD 23 in Hyderabad combine DfMA and site built scopes: repeatable assemblies are prefabricated while site work completes the system.
- 1
BIM LOD 400 and 500
Coordinated shop model and as built model for both blocks.
- 2
Materials and supports
Approved supply delivered into the DfMA setup.
- 3
Service prefabrication
Fire protection and HVAC spools and assemblies built off site.
- 4
Factory QA
Inspection, testing and release records for every module.
- 5
Site integration
Lift, interconnect, test and hand over.
On the campus
HYD 22 and HYD 23
HYD 22: fire protection low side, 80 MW block. HYD 23: HVAC low side, 30 MW block. Modules travel about 40 km from the DfMA setup.
Responsibility
Unique Engineers designs, supplies and prefabricates the MEP services and tests and commissions them; the DfMA agency builds frames, assembles, transports and installs the modules.
Why Unique Engineers
More of what we add.
Prefabrication at Bhondsi
Our own yard in Gurugram cuts, joins, tests and tags assemblies before they reach site.
Learn moreFloor kits
Each repeating floor arrives as one tagged kit and is installed in one fix, with nothing cut at height.
Learn moreAI native workflows
AI copilots for tender extraction, method statements, contract review and meeting synthesis, signed off by the accountable engineer.
Learn moreIntelligent buildings
BMS and controls delivered in house, with AI for predictive maintenance and energy savings after handover.
Learn moreStart a conversation